Quantcast
Channel: Reprap Forum - RAMPS Electronics
Viewing all articles
Browse latest Browse all 1807

Common ground? (no replies)

$
0
0
I am rewiring my Prusa I3 Rework and was looking at the number of wires needed for the hot end assembly. My setup has the following wires going to the carriage:
  • stepper - 4 wires
  • 24v 40W heater - +24V, GND
  • E3Dv6 fan - +24V, GND
  • part cooling fan - +24V, GND
  • thermistor - 2 wires
  • BLTouch - SERVO SIGNAL, SERVO +5V, SERVO GND,

I was thinking at the very least I could combine the ground wires of the heater and fans and maybe the BLTouch if the +5V ground isn't isolated from the +24V ground.

Has anyone tried this?

Thanks,

Viewing all articles
Browse latest Browse all 1807

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>